About the project:

This project’s objective is the reconstruction of high pressure wastewater network from pumping station “Singera”, “Codru”, “DOC”, until Wastewater Treatment Plant Chisinau. This project has 2 stages:

  • Stage 1 – Development of the main network scheme and execution of hydraulic calculation, coordination the scheme with the Beneficiary.
  • Stage 2 – Elaboration of the scheme location of sewerage network, execution of the project.