About the Project:

– Elaboration of technical solutions for the 6kV distribution point;
– Elaboration of the general plan “GP”;
– Preparation of architectural solutions “AS”;
– Technical Drawings for External Power Supply Networks “EPSN”;
– Design of building elements “BE”;
– Design of heating and ventilation systems “IV”;
– Technical Drawings for Inland Water Supply and Sewerage Networks;
– Fire alarm and automation;
– Electrical power equipment, indoor / outdoor lighting.